Hawksmoor Project – A Timeline

Hawksmoor Project - A Timeline



 

THE CLIENT


Pure Fitout are proud to have delivered sympathetic restoration works to a listed building alongside full interior fitout and bespoke joinery and metalwork for world renowned restaurant chain Hawksmoor.

The first Hawksmoor branch opened in Spitalfields in East London in 2006 and have since launched over a dozen locations worldwide in cities like London, Manchester, New York, Chicago and Edinburgh. Their stellar reputation has escalated year on year, culminating in Hawksmoor being jointly crowned the world’s best steak restaurant in 2022.
 

 

THE LOCATION


Co-founders Will Beckett and Huw Gott had Dublin on their radar as a new location for some time. “We’ve been coming to Dublin for years to spend time in one of our favourite cities for food and drink, always keeping an eye open for a beautiful space. When we saw the former National Bank on 34 College Green, we fell in love,” noted Will. It was decided that the landmark building on College Green, Dublin 2, designed by William Barnes in the mid-1840s was the perfect fit for Hawksmoor’s first Irish restaurant.

The spectacular, listed building boasts a decorative, hemispherical 40-foot cast-iron dome set on dramatic Corinthian columns and ornate, elaborate plasterwork. Such is typical of Hawksmoor, the design brief included the instruction to restore as many of these original features as possible.

Likewise, the use of reclaimed materials, a Hawksmoor signature, were to be incorporated within the project. Reclaimed doors and repurposed antique lighting were key elements of the final design alongside the installation of stunning parquet floors throughout.
 


THE TIMELINE



 
 

 
 

 
 

 
 

 
 

 
 


    CALL US NOW ON

    +44 2895 072 600


    GET IN TOUCH


    X
    GET IN TOUCH